A project's Cost Variance (CV) is simply the difference between the Earned Value (EV) and the Actual Cost (AC). The value is positive if the budgeted cost of the work performed is greater than the actual cost of the work performed. In other words, CV is positive whether a project is under the budget.

`CV=EV-AC`